Florida Is Building a Highway That Can Wirelessly Charge EVs
SMRTR summary
Florida will begin construction in 2026 on a groundbreaking 3/4-mile highway segment that wirelessly charges electric vehicles while they drive at normal speeds. This innovative stretch is part of the larger 4.4-mile State Road 516 expressway project, representing a small-scale test that could revolutionize how EVs are powered and eliminate range anxiety concerns.
SMRTR provides this summary for quick context. The original article belongs to Startup News.
Read the original article