UK recycles 16,000 tons of demolished nuclear plant concrete for new reactor site
SMRTR summary
Sizewell C nuclear facility is reusing 16,500 tons of recycled concrete from demolished Sizewell A, preventing 30.8 tons of CO₂ emissions and reducing costs for the £38 billion project.
SMRTR provides this summary for quick context. The original article belongs to Interesting Engineering.
Read the original article