Google to source nuclear power from Iowa plant set for 2029 restart
SMRTR summary
Google partnered with NextEra Energy to restart Iowa's Duane Arnold nuclear plant by 2029, purchasing 600 MW through a 25-year agreement to power AI operations.
SMRTR provides this summary for quick context. The original article belongs to Interesting Engineering.
Read the original article