Former nuclear site turned into 800 MWh giant battery to power 100,000 homes
SMRTR summary
EnBW is transforming a former nuclear site in Philippsburg into a 400 MW/800 MWh battery storage facility, aiming to balance the grid, store renewable energy, and power up to 100,000 homes daily, with potential operation by mid-2027.
SMRTR provides this summary for quick context. The original article belongs to Interesting Engineering.
Read the original article